ROV inspects Fukushima Nuclear Power Plant

Images from a compact, purpose-built ROV have just been released showing considerable damage to Unit 1 of the Fukushima nuclear power plant. The power plant was severely damaged by an earthquake-caused tsunami in March 2011 and these images show core support pedestal damage, raising concerns that another major earthquake could put the power plant at risk.

Article at: DNAIndia 05apr23

New Underwater Servos by Blue Trail Engineering

We are excited to announce Blue Trail Engineering has released a new SER-20XX series of underwater servos , depth-rated to 200 meters, offering increased mounting flexibility, and are optionally available as a kit.

Machined enclosure instead of injection-molded, meaning: walls are thicker, making the unit more durable and giving an increased depth rating of 200 meters; surface finish is smoother and tolerances are tighter, making the O-ring seals more reliable, and; external surfaces are flat for easier mounting from either the side or the top

6-mm “D-shaft” output shaft instead of a square shaft, making it easier to attach to your device using a simple set screw

Available kit option, made possible by an easier assembly process. The usual pre-assembled and tested versions will still be available.

Contact us for pricing and availability